Charlie just told us the upstairs will done by November 5!
If there are any volunteers out there wouldn't mind helping us, we could use a hand with;
1.Hauling our ground-floor belongings upstairs (We'll be minimizing how much stuff that is as much as possible).
2.Breaking down the remaining plaster & lathe on the ground floor.
3.Drinking our beer afterwards.
When I get home tonight I should try to track down the hardhats...
If there are any volunteers out there wouldn't mind helping us, we could use a hand with;
1.Hauling our ground-floor belongings upstairs (We'll be minimizing how much stuff that is as much as possible).
2.Breaking down the remaining plaster & lathe on the ground floor.
3.Drinking our beer afterwards.
When I get home tonight I should try to track down the hardhats...